Free working document
The NFPA 70B (2023) EMP records checklist.
Every record a documented Electrical Maintenance Program is expected to produce, on one printable page. Walk your file against it before an auditor, AHJ, or insurer does. Free — no email wall.
EZ70B · Phase Tech LLC
NFPA 70B (2023) EMP records checklist
The records a documented Electrical Maintenance Program (EMP) is expected to produce — organized the way auditors, AHJs, and insurers ask for them. Print it, walk your file, and mark what you can produce today.
Facility: ____________________________ Reviewed by: ____________________ Date: ____________
01 — Program setup
NFPA 70B (2023) Ch.4The basics every electrical maintenance program starts with.
- A written EMP document, scoped to each facility the program coversChapter 4 expects a documented program — not an informal practice.
- Every location covered by the program is listed in it
- An equipment survey completed for each locationThe survey sets maintenance priorities: what is installed, where, and in what condition.
02 — Program roles & qualifications
NFPA 70B (2023) Ch.4A named program owner, and qualified people doing the work.
- A named EMP Coordinator accountable for running the program"Maintenance handles it" does not name anyone.
- Designated Qualified Persons for the electrical maintenance workIn-house staff or your licensed electrical contractor — either way, named.
- Training records for each Qualified Person: training or certification name, plus completion dateNFPA 70E calls for retraining at intervals not exceeding three years.
03 — Equipment records
NFPA 70B (2023) Ch.6An accurate inventory and one-line diagram are the backbone of the program.
- A current equipment inventory: every asset with its location and type
- Nameplate details recorded for each asset (manufacturer, model, ratings)
- A one-line diagram of the electrical system, kept current as equipment changesUsually the first artifact a loss-control engineer or inspector asks to see.
- Panel schedules with circuits labeled
04 — Inspections & maintenance
NFPA 70B (2023) Ch.9Maintenance intervals tied to each piece of equipment, and dated records of the work.
- A maintenance interval assigned to each asset, by equipment class and assessed condition
- Dated inspection records: what was done, who performed it, and what was foundA record without a name and a date barely counts as a record.
- No intervals silently overdue — overdue work is scheduled or its deferral documented
05 — Findings & corrective action
NFPA 70B (2023) Ch.4A documented process to act on what inspections turn up.
- A log of findings from every inspection, each with a severity
- Corrective-action tracking from each finding through resolution
- Deferred findings reviewed on a scheduleDeferred is not resolved.
06 — Engineering studies
NFPA 70B (2023) Ch.6 · NFPA 70E 130.5PE-led studies on file, refreshed when the system materially changes.
- Short-circuit study on file
- Protective-device coordination study on file
- Arc-flash risk assessment on file (NFPA 70E 130.5)
- A re-study trigger process: studies refreshed when the system materially changesA new transformer, a major load addition, or replaced switchgear should prompt a review.
Why these records matter regardless of local adoption: 29 CFR 1910.303(b)(1) requires that "Electric equipment shall be free from recognized hazards that are likely to cause death or serious physical harm to employees," and OSHA increasingly uses NFPA 70B as the recognized industry standard for measuring whether that obligation is met.
This checklist summarizes the records a documented Electrical Maintenance Program is commonly expected to produce under NFPA 70B (2023). Chapter references are kept at the chapter level; the standard itself is the authoritative text, and the edition adopted in your jurisdiction, your AHJ, and your insurer control the specifics. It is a working aid, not legal advice.
Find the online version and more guides at ez70b.com/resources
Keep NFPA 70B (2023) guidance coming
Subscribe and confirm your email — we'll take you straight back to this checklist, plus send occasional NFPA 70B (2023) guidance and EZ70B product updates. Double opt-in, no spam; unsubscribe anytime.
EZ70B produces and organizes the records on this checklist as you work.
Start your 14-day trial →